ShimLift
Height-adjustable wedge fastening that solves the problem of hanging sleepers. At transitions from ballasted to ballastless track, for example, but also under insulated rail joints. Up to 30 mm of correction.
ShimLift is a height-adjustable rail fastening for many types of sleepers. An adjustable wedge under the rail, paired with a counter-wedge, is the core of a simple solution and ensures well-supported track.
Where tamping wears the ballast bed and holds only briefly, ShimLift delivers a lasting, stable track alignment. The system has been applied successfully in several countries.
The problem it solves
Hanging sleepers at transitions are tamped, not solved.
At transitions from ballast to direct-fixation track, at level crossings, for instance, the track subsides and voids form under the sleepers. These hanging sleepers cause dynamic forces every time a train passes the transition, damaging superstructure components and degrading passenger comfort.
The usual answer is the tamping machine. Its effect is only temporary, and every tamping cycle wears the ballast bed, so the voids return, and the machine returns with them.
A wedge goes under the rail.
The height-adjustable wedge is the core of the system. It sits under the rail in an adjustable fastening that suits many types of sleepers.
The sleeper is properly supported again.
Wedge and counter-wedge together enable height adjustment of the rail, restoring a stable track alignment.
Up to 30 mm of correction.
ShimLift corrects the rail height by up to 30 mm, more than sufficient in practice to eliminate the voids, without calling in the tamping machine.
The wedge system
Height adjustment in 1 mm steps
A base shim and five filler shims set the rail height at hanging sleepers, in 1 mm steps from 1 to 30 mm.
Rail height correction
+8mm
Filler shim
V140 / 6 – 11 mm
Even at its lowest setting the system sits 1 mm higher than a standard bedding plate; each shim therefore delivers 1 mm above its marked steps (V140 / 0 – 5 gives 1 – 6 mm).
ShimLift type S on an NS90 sleeper · true scale, 54E1 rail · 1 mm step profileTap the hammer, drag the filler shim or use the slider. Drag beside it to rotate.
Filler shim
The filler shim is driven in by hand, one tap per millimetre; the opposed step faces lock the shims in position once the clips are fastened.
Base shim
The base shim lies with its flat side on the sleeper, teeth facing up. On type S it has no key underneath: its side teeth engage in the locking blocks.
Locking block
A locking block stands on each side of the rail, fixed to the sleeper with a low M22 nut and a disc spring. The locking blocks also hold the base shim in place.
Spring clip
The spring clip clamps the rail; its nut is tightened to 250 Nm. Clamping the rail fixes the shims in position.
Stud and nuts
The M22 stud replaces the existing collar-head bolt in the sleeper. An M22 nut with a lock washer presses on the spring clip through the pressure piece.
Rail
Shown here: 54E1 rail. The filler shim fills the space between the rail and the base shim.
Sleeper
NS90 concrete sleeper, prepared for Skl fastening. ShimLift corrects the distance between rail and sleeper without agitating the ballast.
Benefits
A ballast bed that no longer needs frequent tamping.
Improved track alignment and the elimination of voids mean less mechanical and manual tamping, less machine deployment and more track availability.
Longer life for track and ballast.
Lower life-cycle costs through a longer service life of track and ballast bed, instead of tamping cycles that wear the ballast and hold only temporarily.
Less energy, less CO₂.
Lower energy consumption and lower CO₂ emissions, maintenance that does not lean on recurring tamping runs.
In service at many problem locations.
ShimLift is in successful use at transitions to bridges and at level crossings, among other locations, and as effective support for insulated rail joints in the track.
Certification
Germany · Eisenbahn-Bundesamt Approval procedure in its final stage
Belgium · Infrabel Official certification Approved and in service Officially certified by Infrabel, the Belgian infrastructure manager; ShimLift is in service on the Belgian network.
In the field
Documentation & links
Manuals, brochures and where to order.
Request more information about ShimLift.
Datasheets, installation manuals and reference projects. An engineer replies within one working day.
Or call +31 (0)162-70 05 20
Thank you, your request has been sent.
An engineer will get back to you within one working day.